Navarre High School Technical Lab/ Classroom Addition
Navarre, Florida
Click to enlarge, see below for more information
Construction Cost: $770,000
Size: 3,633 SF
Mechanical Principal: Gene Schmidt
Mechanical/Plumbing Engineer: William Jones
Electrical Principal: Todd Nicholson
Services Provided: Mechanical, Electrical, Plumbing, Communications
Schmidt Consulting Group, Inc. is providing design services for the new Technical Lab/Classroom addition at Navarre High School.
MECHANICAL / PLUMBING
HVAC Design
HVAC Mechanical and plumbing design included a DX split system heat pump system. Plumbing for domestic and sanitary water was completed. The addition included a water closet, lavatory, and shower, with associated drains and fixtures.
ELECTRICAL
Electrical design was completed for lighting and associated fixtures, power/data/phone receptacles, and connections to HVAC equipment. An existing main electrical wall panel was used, with a new feeder connected.
COMMUNICATIONS
Communications design included additions to the fire alarm system and intercom system.